Planning for Tennis Court Construction: A Step-by-Step Guide

Aerial view of tennis courts in Ebensburg, PA surfaced with blue and green Laykold acrylic

Building a tennis court is one of the best investments a homeowner, school, club or municipality can make — but it's also a serious construction project, and the planning you do before the first machine arrives determines whether your court lasts decades or disappoints in five years. In Western Pennsylvania, where freeze-thaw winters punish any outdoor surface, that planning matters even more.

At Fast Times Tennis, we've been constructing and resurfacing acrylic sport courts since 1987 — more than 2,400 courts across Western PA, Western NY, Eastern OH, Northern MD and West Virginia. This is the same step-by-step process we walk every client through, whether it's a private backyard court or a multi-court municipal facility.

Step 1: Define Your Goals and Requirements

Every successful court project starts with honest answers to a few questions:

  • Purpose. Is this a private residential court, a school or municipal facility, or a club court with heavy daily play? Usage drives almost every later decision.
  • Size and layout. A regulation tennis court measures 60' × 120' including runouts, and ideal orientation runs north-south so neither player stares into the sun. Know your available footprint early — and if space is tight, ask about pickleball or multi-sport layouts instead.
  • Surface. We build acrylic hard courts — the Laykold system used at the US Open, and Acrytech for dedicated pickleball courts. We don't build clay or grass courts; in our climate, acrylic is simply the surface that holds up — and for extra comfort underfoot, ask about a cushioned tennis or pickleball court.
  • Budget. New construction cost depends on excavation, base work, drainage and amenities like fencing, lighting and net posts. We provide free written estimates so you can plan with real numbers.

Step 2: Assess the Site

The site decides more than any other factor. A proper assessment looks at:

  • Topography and slope. A court needs a near-perfect plane — about 1% slope for drainage, no more. Significant grade changes mean more excavation and retaining work.
  • Drainage. Water is the enemy of every court. In western PA, poor drainage plus freeze-thaw cycles will destroy a court from below. We evaluate how water moves across and away from the site before anything else.
  • Accessibility. Excavators, paving equipment and material trucks all need room to work. Tight access is solvable, but it affects planning and cost.
  • Soil conditions. Stable, well-draining soil supports a long-lasting base; problem soils need to be addressed before paving, not after cracks appear.

Step 3: Engage Experienced Professionals

Court construction is a specialty trade. A general paving contractor can lay asphalt — but building a surface that drains at 1%, meets ASBA specifications and plays true for decades is different work. When you evaluate builders, ask how many courts they've built, what surface systems they install, and whether they're certified for the repair systems they warranty. We're a certified RiteWay Crack Repair and Armor Crack installer, we build to ASBA specifications, and we've been doing exactly this work since 1987.

Step 4: Design, Permits and Approvals

Most Pennsylvania municipalities require permits for new court construction — zoning setbacks, stormwater management and sometimes lighting or fence height rules all come into play. Schools and municipalities may have their own bid and approval processes. A good court builder helps you navigate this: we handle the layout, color selection and specification details, and we flag permitting requirements early so approvals don't stall your season.

Step 5: Construction

A typical new court build moves through these phases:

  • Excavation and grading to establish the plane and drainage pattern
  • Stone sub-base installation and compaction — the foundation everything rides on
  • Asphalt paving, followed by a proper cure period before any coating goes down
  • Acrylic surfacing — resurfacer coats, then Laykold texturized color coats in your chosen colors
  • Striping and accessories — regulation lines, net posts, fencing and any lighting or extras

Step 6: Plan for Maintenance From Day One

A new acrylic court is low-maintenance, not no-maintenance. Keep it clean, keep water moving off it, and plan on resurfacing every four to eight years depending on usage — our ultimate guide to tennis court resurfacing covers intervals and warning signs in detail. Courts that get this simple care routinely outlast their owners' expectations; courts that don't, won't.

Ready to Start Planning?

The best first step costs nothing: a free on-site evaluation. We'll walk your property, talk through goals and layout, and give you a written, no-pressure estimate with real numbers to plan around. Browse our tennis court construction and resurfacing services, see finished courts in our project gallery, or reach out through our contact page.

Call (724) 388-0467 for a free quote — let's plan a court you'll be proud of for decades.

Free Estimates

Questions About Your Court?
Let’s Talk.

Call now to get on our schedule — our season is very busy! Free estimates, no pressure.

Call Now Free Estimate